Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 91: Area 3 U-3fi Injection Well, Nevada Test Site, Nevada, Revision 0, December 2007
Author(s) -
Restoration, NSTec Environmental
Publication year - 2008
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/926203
Subject(s) - riprap , fencing , cracking , erosion , closure (psychology) , subsidence , environmental science , vegetation (pathology) , hydrology (agriculture) , forensic engineering , geotechnical engineering , geology , engineering , computer science , structural basin , geomorphology , medicine , chemistry , pathology , parallel computing , economics , market economy
This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for calendar year 2007. CAU 91 is inspected every six months. The first inspection was conducted on March 29,2007, and the second inspection was conducted on September 27, 2007. Vegetation growth around the edge of the aboveground monument concrete pad was observed during the March inspection. This vegetation was removed on May 24,2007. All access roads, fences, gates, and signs were in excellent condition. No settling, cracking, or erosion was observed on the cover, and the use restriction had been maintained. No issues were identified, and no corrective actions were needed as a result of the September inspection. The post-closure inspection checklists for CAU 91 are attached. Photographs and field notes taken during site inspections are maintained in the project files

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom