DOI - 10.2172/912629
Subject(s) - debris , hazardous waste , environmental science , truck , waste management , asbestos , mining engineering , engineering , geology , oceanography , materials science , metallurgy , aerospace engineering
This document summaries the actions taken to remove asbestos-reinforced-concrete (transite) pipe and miscellaneous debris from Power Purst Facility (PBF)-33 and PBF-34 sites. Removal of pipe and debris were performed in November 2006 in accordance with the requirements discussed in notice of soil disturbance NSD-PBF-07-01. Debris at these two sites were classified as industrial waste that could be disposed at the Central Facilities Area (CFA) landfill at the Idaho National Laboratory. Asbestos removal was performed as Class IV asbestos cleanup work. All transite pipe was double bagged and dispositioned in the INL Landfill Complex at CFA. The remaining miscellaneous debris was loaded into dump trucks and taken to the INL Landfill Complex at CFA for final disposition. Cleanup actions are complete for both sites, and no debris or hazardous constituents remain. Therefore, both sites will be classified as No action sites

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here