Heber geothermal binary demonstration project quarterly technical progress report, July 1, 1981--September 30, 1981
Author(s) -
R.G. Lacy,
Richard F. Allen,
R.A. Alsup,
G.S. Liparidis,
G.D. Van De Mark
Publication year - 1983
Language(s) - English
Resource type - Reports
DOI - 10.2172/895640
Subject(s) - geothermal gradient , electric power , work (physics) , geothermal power , environmental science , power station , engineering , power (physics) , geothermal energy , library science , electrical engineering , geology , mechanical engineering , computer science , physics , quantum mechanics , geophysics
The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1981, through September 30, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the US Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination