z-logo
open-access-imgOpen Access
Validation Test Report For The CRWMS Analysis and Logistics Visually Interactive Model Calvin Version 3.0, 10074-Vtr-3.0-00
Author(s) -
Steven M. Gillespie
Publication year - 2000
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/893437
Subject(s) - test (biology) , test plan , interim , acceptance testing , computer science , code (set theory) , test data , plan (archaeology) , spent nuclear fuel , simulation , operations research , reliability engineering , engineering , statistics , nuclear engineering , mathematics , software engineering , programming language , archaeology , set (abstract data type) , weibull distribution , biology , history , paleontology
This report describes the tests performed to validate the CRWMS ''Analysis and Logistics Visually Interactive'' Model (CALVIN) Version 3.0 (V3.0) computer code (STN: 10074-3.0-00). To validate the code, a series of test cases was developed in the CALVIN V3.0 Validation Test Plan (CRWMS M&O 1999a) that exercises the principal calculation models and options of CALVIN V3.0. Twenty-five test cases were developed: 18 logistics test cases and 7 cost test cases. These cases test the features of CALVIN in a sequential manner, so that the validation of each test case is used to demonstrate the accuracy of the input to subsequent calculations. Where necessary, the test cases utilize reduced-size data tables to make the hand calculations used to verify the results more tractable, while still adequately testing the code's capabilities. Acceptance criteria, were established for the logistics and cost test cases in the Validation Test Plan (CRWMS M&O 1999a). The Logistics test cases were developed to test the following CALVIN calculation models: Spent nuclear fuel (SNF) and reactivity calculations; Options for altering reactor life; Adjustment of commercial SNF (CSNF) acceptance rates for fiscal year calculations and mid-year acceptance start; Fuel selection, transportation cask loading, and shipping to the Monitored Geologic Repository (MGR); Transportation cask shipping to and storage at an Interim Storage Facility (ISF); Reactor pool allocation options; and Disposal options at the MGR. Two types of cost test cases were developed: cases to validate the detailed transportation costs, and cases to validate the costs associated with the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M&O) and Regional Servicing Contractors (RSCs). For each test case, values calculated using Microsoft Excel 97 worksheets were compared to CALVIN V3.0 scenarios with the same input data and assumptions. All of the test case results compare with the CALVIN V3.0 results within the bounds of the acceptance criteria. Therefore, it is concluded that the CALVIN V3.0 calculation models and options tested in this report are validated

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom