Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Fourth Quarter 1983
Publication year - 1983
Language(s) - English
Resource type - Reports
DOI - 10.2172/883379
Subject(s) - hydroelectricity , quarter (canadian coin) , commission , production (economics) , cogeneration , wind power , engineering , table (database) , environmental science , block (permutation group theory) , business , agricultural economics , electricity generation , operations management , power (physics) , economics , finance , computer science , geography , mathematics , electrical engineering , database , archaeology , physics , quantum mechanics , macroeconomics , geometry
At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small power production projects was 305, with a total estimated nominal capacity of 2,389 MW. Of these totals, 202 projects, capable of producing 566 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration, solid waste, or biomass projects had signed 101 contracts with a potential of 1,408 MW. In total, 106 contracts and letter agreements had been signed with projects capable of producing 1,479 MW. PG and E also had under active discussion 29 cogeneration projects that could generate a total of 402 MW to 444 MW, and 13 solid waste or biomass projects with a potential of 84 MW to 89 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 28, with a generating capability of 618 MW. Also, discussions were being conducted with 14 wind farm projects, totaling 365 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 8 other small wind projects under active discussion. There were 59 hydroelectric projects with signed contracts and a potential of 146 MW, as well as 72 projects under active discussion for 169 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E was planning to construct. Table B displays the above information. In tabular form, in Appendix A, are status reports of the projects as of December 31, 1983

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here