z-logo
open-access-imgOpen Access
PGandE Geysers Retrofit Project, Milestone Report No. 2 (Units 5-12)
Publication year - 1979
Language(s) - English
Resource type - Reports
DOI - 10.2172/883326
Subject(s) - milestone , geology , engineering , computer science , geography , archaeology
Milestone Report No. 1 was delivered on June 1, 1979 and related to the conversion of Units 1-4. Milestone Report No. 2 describes the conversion of Units 5-12 from direct contact condensers which use the iron-catalyst/peroxide/caustic systems to surface condensers and H{sub 2}S abatement with the Stretford Process Unit. This Report is a 10 week progress report that specifically addresses itself to the differences that are encountered between Units 5-6, 7-10 and 11-12. The task schedule shown in the Summary Section was originally presented to PG and E at the Project Kick-Off Meeting on Monday, April 23. Units 11 and 12 retrofit concept which appears in this report was evaluated with a two pass surface condenser running parallel to the turbine shaft. This concept requires the relocation of the turbine lube oil tank, instrument air compressor and battery storage rack facilities. On Wednesday, June 27, the condenser supplier notified Rogers Engineering that it was feasible to design and install a four pass, two tube bundle condenser at right angle condenser to the turbine-generator shaft. The four pass condenser concept will eliminate the need of relocating equipment sensitive to turbine operation. However, schedule requirements for Milestone Report No. 2 left no time to incorporate the benefits of the concept they believe will be recommended by Rogers. It will appear in the Final Milestone Report No. 4

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here