z-logo
open-access-imgOpen Access
PG and E Geysers Retrofit Project: Milestone Report No. 1
Publication year - 1979
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/883325
Subject(s) - milestone , condenser (optics) , turbine , installation , schedule , engineering , gas compressor , bundle , spare part , steam turbine , mechanical engineering , marine engineering , automotive engineering , operating system , computer science , materials science , physics , light source , archaeology , optics , composite material , history
Rogers Engineering was contracted to determine the technical feasibility and cost/benefit ratios for Pacific Gas and Electric Company to replace the iron-catalyst/peroxide/ caustic systems with surface condensers and Stretford H{sub 2}S abatement systems for Units 1 through 12 at the Geysers. This Milestone No.1 Report is a 6 week progress report and will not have the cost benefit analyses which is planned for in the Final Report. This report will focus only on Units 1 and-3, which are thought of as typical to Units 2 and 4 in our contract. The work performed analyzes the cooling water cycle for both units and determines the turbine operating back pressure as a function of cold water from the existing cooling towers to the new surface condensers. Any power penalty is noted and assessed to the respective turbine-generator with necessary definition for the reason in heat rate deterioration. The direction of Rogers Engineering Co.'s efforts was the conceptual system analysis for Units 1 and 3. But cooling tower performance differences between Units 1 and 2 influenced the similarity of, the cycle thermodynamics and power output at the generator for these two units. We therefore are reporting on Units One and Two. Units Three and Four are identical with some minor location and piping

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom