
INTERNATIONAL COLLABORATION ON CO2 SEQUESTRATION
Author(s) -
Howard J. Herzog,
E Eric Adams
Publication year - 2003
Language(s) - English
Resource type - Reports
DOI - 10.2172/882520
Subject(s) - cruise , norwegian , crew , work (physics) , aeronautics , engineering , environmental science , operations research , geography , mechanical engineering , philosophy , linguistics , aerospace engineering
The main goal of our work during this time period (August 23, 2001-August 23, 2002) was to conduct a field experiment in Norwegian waters. Preparation for the field experiment included building the apparatus, designing and obtaining the measurement systems, planning the logistics (ships, crew, supplies, etc.) and conducting a survey cruise. The survey cruise, conducted in July 2002, is documented in this report. The field experiment, scheduled for August 2002, was postponed when the Norwegian environmental minister revoked our permit under pressure from Greenpeace. Events surrounding the permitting situation are documented in the Appendix