Final report task order number B239641 between the Regents of the University of California and Institute of Experimental Physics task 2: Switch development.
Author(s) -
I.V. Galakhov,
I.A. Gruzin,
S.N. Gudov,
G. A. Kirillov,
Sergei L. Logutenko,
V. M. Murugov,
V.A. Osin,
V.I. Zolotovskii
Publication year - 1994
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/87802
Subject(s) - task (project management) , national ignition facility , electrical engineering , high voltage , power (physics) , voltage , ignition system , order (exchange) , engineering , computer science , physics , systems engineering , aerospace engineering , nuclear physics , business , plasma , inertial confinement fusion , finance , quantum mechanics
The LLNL project of the pulsed power system for the National Ignition Facility requires a switch with the following operational parameters: peak current of 400 kA, the transferred charge of 150 C, operating voltage of 25 kV, and reliable operating life of 10,000 shots. A review of high-power switches is given with detailed studies on vacuum switches and semiconductor switches
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom