z-logo
open-access-imgOpen Access
Technical Proposal Salton Sea Geothermal Power Pilot Plant Program
Publication year - 1975
Language(s) - English
Resource type - Reports
DOI - 10.2172/860625
Subject(s) - brine , geothermal gradient , environmental science , activity based costing , power station , scope (computer science) , waste management , engineering , computer science , business , geology , physics , marketing , geophysics , electrical engineering , thermodynamics , programming language
The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and injection systems necessary to serve the pilot power and mineral recovery plants planned for Phase 3. The scope of the Area Resource Test Facility Subprogram will include evaluation, costing, design, construction and operation of an ARTF that can serve as a field facility for testing and evaluating high temperature, high salinity geothermal brine utilization components and systems being developed by various organizations and laboratories in the United States. [DJE-2005

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here