z-logo
open-access-imgOpen Access
Installation and Measurement of the ATF Injection Kicker
Author(s) -
Piotr Blum
Publication year - 2003
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/813122
Subject(s) - magnet , injector , collider , beam (structure) , linear particle accelerator , physics , electrical engineering , power (physics) , engineering , nuclear physics , mechanical engineering , optics , quantum mechanics
An injection kicker system of the same type as SLC North Damping Ring (NDR, for e-injection) is used at ATF DR for future linear collider development in KEK. The magnet and the power supply have been constructed at SLAC and installed to the ATF DR at June 1996. The system has been operated from the beginning of commissioning, January 1997, to the present operation, July 1997, with single bunch injection mode. The construction and the operation has been done as a part of the collaboration program of the ATF project. The operation characteristics of the injection kicker were measured using beam. The system configuration and the result are described in this paper.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom