z-logo
open-access-imgOpen Access
Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 2: Appendices, AAC, BECR, BH
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/80994
Subject(s) - certification , waste management , engineering , isolation (microbiology) , plan (archaeology) , stakeholder , volume (thermodynamics) , engineering management , operations management , environmental science , political science , geography , public relations , microbiology and biotechnology , archaeology , quantum mechanics , law , physics , biology
This report describes the conceptual design of a system the Department of Energy (DOE) may implement for compliance with the requirement to control access to the disposal site. In addition, this report addresses the scheduling process for control of inspection, maintenance, and periodic reporting related to Long Term Monitoring which addresses the monitoring of disposal system performance, environmental monitoring in accordance with the Consultation and Cooperation Agreement between the DOE and the state of New Mexico, and evaluation of testing activities related to the Permanent Marker System design. In addition to access control addressed by this report, the controlling or cleaning up of releases from the site is addressed in the Conceptual Decontamination and Decommissioning Plan. The monitoring of parameters related to disposal system performance is addressed in the Long Term Monitoring Design Concept Description. Together, these three documents address the full range of active institutional controls planned after disposal of the TRU waste in the WIPP repository

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here