
DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR
Author(s) -
UNKNOWN
Publication year - 2001
Language(s) - English
Resource type - Reports
DOI - 10.2172/806998
Subject(s) - generator (circuit theory) , gas generator , ignition system , gas turbines , automotive engineering , engineering , reliability engineering , mechanical engineering , power (physics) , aerospace engineering , physics , quantum mechanics
The objectives of this report period were to continue the development of the Gas Generator design, to complete the hardware and ancillary hardware fabrication, and commence the Test Preparations for the testing of the non-polluting unique power turbine drive gas generator. Focus during this report period has been on testing the Gas Generator. Because of unacceptable delays encountered in a previously competitively selected test site, CES initiated a re-competition of our testing program and selected an alternate test site. Following that selection, CES used all available resources to make preparations for testing the 10 Mw Gas Generator at the new testing site facilities of NTS at Saugus, CA. A substantial portion of this report period was devoted to Testing Preparations, i.e. test facility development, cold- flow testing, calibration testing, performing igniter ignition testing, and then commencement of the completely assembled Gas Generator Assembly Testing, in process at this writing