River Protection Project (RPP) performance for the month of July 2000 was very good. The most significant accomplishments that occurred during the month include the following: The Interim Stabilization Project pumped approximately 30,000 gallons from four tanks. Project-to-date (since June 1998) volume pumped is approximately 808,000 gallons. Five tanks have been interim stabilized this fiscal year, and tanks 241-S-106,241-U-103, and 241-U-105 are being evaluated to determine if the stabilization criteria have been met. Out of the 149 single-shell tanks (SSTs), 124 tanks have been stabilized. Pumping this waste from the single-shell tanks to more secure double-shell tanks (DSTs) supports stabilization of the waste tanks and mitigates leakage to the environment. The Interim Stabilization Project is planned to complete by September 2004. Waste Characterization obtained one grab sample in the month of July 2000. A total of 14 core samples, 12 grab samples, and 6 vapor samples have been taken fiscal year-to-date (FYTD) in support of three key FY 2000 sampling milestones. The Waste Treatment Plant Design and Operation organizations have been developed and staffed, including transitioning BNFL Inc./Bechtel National Inc. employees to CHG. Since the termination of the BNFL contract, CHG has temporarily assumed the work scope for design and operation of the Waste Treatment Plant. A new waste treatment facility will be built at the Hanford Site in which highly radioactive waste from the tanks will be turned into glass and permanently stored. Approval of the Notice of Construction (NOC) for the AN Farm tank retrieval system was received from the U.S. Department of Energy (DOE) and the Environmental Protection Agency on July 21,2000. This is a significant step forward for Project W-211, ''Initial Tank Retrieval Systems'' in preparing waste for delivery to the Waste Treatment Plant
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom