Cold Vacuum Drying (CVD) Set Point Determination
Author(s) -
Barbara L. Philipp
Publication year - 2000
Language(s) - English
Resource type - Reports
DOI - 10.2172/804794
Subject(s) - purge , torr , volume (thermodynamics) , atmospheric pressure , helium , environmental science , mechanical engineering , nuclear engineering , physics , engineering , thermodynamics , waste management , meteorology , atomic physics
The Safety Class Instrumentation and Control (SCIC) system provides active detection and response to process anomalies that, if unmitigated, would result in a safety event. Specifically, actuation of the SCIC system includes two portions. The portion which isolates the MCO and initiates the safety-class helium (SCHe) purge, and the portion which detects and stops excessive heat input to the MCO annulus on high Tempered Water (TW) inlet temperature. For the MCO isolation and purge, the SCIC receives MCO pressure (both positive pressure and vacuum), helium flow rate, bay high temperature switch status, seismic trip status, and time-under-vacuum trips signals. The SCIC system will isolate the MCO and start an SCHe system purge if any of the following occur. (1) Isolation and purge from one of the SCHe ''isolation'' and ''purge'' buttons is manually initiated (administratively controlled). (2) The first vacuum cycle exceeds 8 hours at vacuum, or any subsequent vacuum cycle exceeds 4 hours at vacuum without re-pressurizing the MCO for a minimum of 4 hours. (This is referred to as the 8/4/4 requirement and provides thermal equilibrium within the MCO.) (3) MCO is below atmospheric pressure and the helium flow is below the minimum required to keep hydrogen less than 4% by volume. (When MCO pressure is below 12 torr there is insufficient hydrogen to exceed the 4% level and therefore no purge is required. A five minute time delay on low flow allows flow to be stopped in order to reach < 12 torr.) (4) The duration for the transition from above atmospheric pressure to vacuum (time to reach pressure below -11.7 psig [{approx}155 torr]) exceeds 5 minutes. (5) The duration for the transition from vacuum (below -11.1 psig [{approx}185 torr]) back to pressure [greater than 0.5 psig] exceeds 5 minutes. (6) MCO reaches a vacuum state (<0.5 psig) without an adequate, verified purge volume. (The MCO must be maintained above atmospheric pressure (approximately 0.5 psig) to prevent oxygen ingress unless a purge of adequate volume has been completed. During bulk water draining, the MCO must remain above atmospheric pressure.) (7) Seismic event of sufficient magnitude is detected. (Trip point is below the Uniform Building Code levels). Setpoint determination is required for trips C through H. Sensor error determination for additional safety-significant sensors used by the HVAC system or the SCHe system are also required

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here