Acceptance for Beneficial Use Pumping Instrumentation and Control Skid N
Author(s) -
Michael Koch
Publication year - 2000
Language(s) - English
Resource type - Reports
DOI - 10.2172/801863
Subject(s) - skid (aerodynamics) , flammable liquid , instrumentation (computer programming) , engineering , environmental science , automotive engineering , waste management , computer science , mechanical engineering , operating system
This is a final Acceptance for Beneficial Use (ABU) for Pumping and Instrumentation Control (PIC) skid ''N''. PIC skid ''N'' is ready for pumping tank U-109. All the testing and documentation has been completed as required on the AE3U checklist. This AE3U covers only the readiness of the PIC skid ''N''. Other U-farm preparations including dilution tank fabrication, portable exhauster readiness, leak detection, valve pit preparation, and the Operation Control Station readiness are not part of this ABU. PIC skid ''N'' is a new skid fabricated and tested at Site Fabrication Services. The skid controls the jet pump and monitors various instruments associated with the pumping operation. This monitoring includes leak detection along the waste transfer route and flammable gases in the pump pit. This Acceptance for Beneficial Use documents that Pumping Instrumentation and Control (PIC) skid ''N'' is ready for field use. This document does not cover the field installation or operational testing