Interface Control Document Between the Double Shell Tanks (DST) System and the Plutonium Finishing Plan (PFP)
Author(s) -
T.H. May
Publication year - 1999
Language(s) - English
Resource type - Reports
DOI - 10.2172/798654
Subject(s) - interface (matter) , documentation , plutonium , shell (structure) , process (computing) , plan (archaeology) , control room , control (management) , radioactive waste , computer science , systems engineering , engineering , mechanical engineering , operating system , waste management , civil engineering , physics , nuclear physics , archaeology , bubble , maximum bubble pressure method , artificial intelligence , history
This document identifies the requirements and responsibilities for all parties to support waste transfer from the Plutonium Finishing Plant (PFP) facility to the Double-Shell Tank (DST) System of the River Protection Project (RPP). This Interface Control Document (ICD) will not attempt to control the physical portion of this interface because the physical equipment making up this interface, and any associated interface requirements, are already in place, operational and governed by existing operating specifications and other documentation. The PFP and DST Systems have a direct physical interface (the waste transfer pipeline) that travels between the 241-2 Building (TK-D5) and DST SY-102 via 244-TX double-contained receiver tank (DCRT). The purpose of the ICD process is to formalize working agreements between the RPP DST System and organization/companies internal and external to RPP. This ICD has been developed as part of the requirements basis for design of the DST System to support the Phase I Privatization effort

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here