Test Plan for Radioactive Testing of a Vertical Direct Denitration Calciner
Author(s) -
J A COMPTON
Publication year - 1999
Language(s) - English
Resource type - Reports
DOI - 10.2172/797769
Subject(s) - authorization , component (thermodynamics) , plan (archaeology) , test (biology) , test plan , shutdown , function (biology) , computer science , engineering , nuclear engineering , computer security , geology , physics , mathematics , paleontology , statistics , evolutionary biology , weibull distribution , biology , thermodynamics
The prototype Vertical Denitration Calciner (VDC) is installed in glovebox 188 in the Plutonium Process Support Laboratory (PPSL). Safety analysis contained in WHC-SD-CP-SAR-021 (FSAR) Rev. 0-L and Addendum to WHC-SD-CP-SAR-021, ''Laboratory Prototype Calciner'' establishes the prototype VDC needs to be shut down if a seismic event of greater than 0.07 g occurs. Shut down is to be automatic upon detection of the seismic event. This requires tie-in of various valves and power for the prototype VDC into the existing Seismic Shutdown System for the Ventilation Supply Fans described in FSAR 5.4.1.2.4. The proposed changes covered by this USQ evaluation include: (1) the physical tie-in modifications, including drawings and Engineering Change Notice (ECN), (2) the work package for accomplishing the modifications, (3) the changes to the System Description Documents, (4) the changes to the Safety Equipment List necessitated by the modifications, and (5) the changes to the failure modes and effects analysis. WHC-SDCP-OSR-010, Plutonium Finishing Plant Operational Safety Requirements Limiting Condition for Operation (LCO) 3.2.3 has been revised to include the requirement for the existing seismic shutdown system to also shut down the laboratory calciner in the event of detection of a greater than 0.07 g seismic event