Acceptance and Operational Test Report for Neutron and Gamma Probe Application to Tank 241-SY-101 MITs
Author(s) -
N.S. Can
Publication year - 1999
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/797690
Subject(s) - instrumentation (computer programming) , set (abstract data type) , test (biology) , nuclear engineering , neutron , computer science , moisture , environmental science , process engineering , computer hardware , database , embedded system , engineering , materials science , operating system , nuclear physics , physics , geology , programming language , composite material , paleontology
This Operational Test Report (OTR) presents the results of the ATP/OTP testing performed to verify that newly procured neutron and gamma probes (reduced diameter design modifications) for operation in the Tank 241-SY-101 MITs are compatible with existing LOW van instrumentation and hardware. This verification was accomplished and a set of moisture data versus elevation were obtained from the Tank 241-SY-101 MITs as part of this testing program
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom