z-logo
open-access-imgOpen Access
242A Distributed Control System Year 2000 Acceptance Test Report
Author(s) -
M.C. Teats
Publication year - 1999
Language(s) - English
Resource type - Reports
DOI - 10.2172/797657
Subject(s) - upgrade , computer science , distributed control system , test (biology) , operating system , software , acceptance testing , control (management) , reliability engineering , process (computing) , control system , software engineering , engineering , paleontology , electrical engineering , artificial intelligence , biology
This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here