DESIGN, FABRICATION, AND TESTING OF AN ADVANCED, NON-POLLUTING TURBINE DRIVE GAS GENERATOR
Author(s) -
UNKNOWN
Publication year - 2002
Language(s) - English
Resource type - Reports
DOI - 10.2172/794329
Subject(s) - fabrication , gas turbines , generator (circuit theory) , gas generator , schedule , test (biology) , electric generator , engineering , automotive engineering , mechanical engineering , computer science , power (physics) , operating system , alternative medicine , pathology , quantum mechanics , biology , medicine , paleontology , physics
The objectives of this report period were to complete the development of the Gas Generator design, which was done; fabricate and test of the non-polluting unique power turbine drive gas Gas Generator, which has been postponed. Focus during this report period has been to complete the brazing and bonding necessary to fabricate the Gas Generator hardware, continue making preparations for fabricating and testing the Gas Generator, and continuing the fabrication of the Gas Generator hardware and ancillary hardware in preparation for the test program. Fabrication is more than 95% complete and is expected to conclude in early May 2002. the test schedule was affected by relocation of the testing to another test supplier. The target test date for hot fire testing is now not earlier than June 15, 2002

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here