z-logo
open-access-imgOpen Access
THROUGH-THE EARTH (TTE) SYSTEM AND THE IN-MINE POWER LINE (IMPL) SYSTEM
Author(s) -
Z.H. Meiksin
Publication year - 2001
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/788109
Subject(s) - line (geometry) , interface (matter) , power (physics) , engineering , work (physics) , function (biology) , thrust , electrical engineering , telecommunications , computer science , operating system , mechanical engineering , physics , mathematics , geometry , bubble , quantum mechanics , maximum bubble pressure method , evolutionary biology , biology
Work has progressed on both subsystems: the through-the-earth (TTE) system and the In-Mine Power Line (IMPL) system. After the Lab prototype of the IMPL system was perfected to function satisfactorily, the thrust of the work focused on building a first production prototype that can be installed and tested inside a mine. To obtain multi-channel voice communication through the TTE system, effort has proceeded to compress voice messages and make the format compatible with the power-line interface protocol

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom