K Basin sludge treatment project chemical procesing baseline time diagram study
Author(s) -
S.C. Klimper
Publication year - 1999
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/782423
Subject(s) - baseline (sea) , duration (music) , structural basin , diagram , environmental science , waste management , process engineering , engineering , mathematics , geology , statistics , physics , oceanography , acoustics , paleontology
This document provides an initial basis for determining the duration of operating steps and the required resources for chemically treating K Basin sludge before transporting it to Tank Farms. It was assumed that all operations would take place within a TPA specified 13-month timeframe
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom