z-logo
open-access-imgOpen Access
K Basin sludge treatment project chemical procesing baseline time diagram study
Author(s) -
S.C. Klimper
Publication year - 1999
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/782423
Subject(s) - baseline (sea) , duration (music) , structural basin , diagram , environmental science , waste management , process engineering , engineering , mathematics , geology , statistics , physics , oceanography , acoustics , paleontology
This document provides an initial basis for determining the duration of operating steps and the required resources for chemically treating K Basin sludge before transporting it to Tank Farms. It was assumed that all operations would take place within a TPA specified 13-month timeframe

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom