z-logo
open-access-imgOpen Access
Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system
Author(s) -
R.M. BOGER
Publication year - 1999
Language(s) - English
Resource type - Reports
DOI - 10.2172/782305
Subject(s) - hoist (device) , deliverable , truck , fabrication , engineering , marine engineering , automotive engineering , systems engineering , mechanical engineering , medicine , alternative medicine , pathology
This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom