z-logo
open-access-imgOpen Access
Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system
Author(s) -
R.M. Boger
Publication year - 1999
Language(s) - English
Resource type - Reports
DOI - 10.2172/782305
Subject(s) - hoist (device) , deliverable , truck , fabrication , engineering , marine engineering , automotive engineering , systems engineering , mechanical engineering , medicine , alternative medicine , pathology
This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here