COOPERATIVE LAND REUSE PROGRAM
Author(s) -
UNKNOWN
Publication year - 1999
Language(s) - English
Resource type - Reports
DOI - 10.2172/772394
Subject(s) - demolition , piping , reuse , offset (computer science) , waste management , engineering , asbestos , present value , value engineering , operations management , environmental science , business , civil engineering , finance , computer science , environmental engineering , materials science , metallurgy , programming language
The objective of this study was to determine what financial return, if any, DOE would realize if they invest solely in removal of the asbestos from these three Hanford steam plants and the associated large bore distribution piping at the site. Once the asbestos was removed the strategy was to bring in companies that specialize in salvage and material re-use and have them remove, at no cost to DOE, the plants and the associated large bore piping. The salvage companies we contacted had said that if they didn't have to remove asbestos, they may be able to realize enough value from these plants to offset their demolition and/or dismantling cost. The results were not what we expected but they do offer DOE some favorable financial alternatives to their present approach. The study concluded that there was very little salvage and/or re-use value remaining in the steam plant material that could be used to offset the demolition and/or dismantling cost. The notable exception to this is the removal of the 24 inch steam piping that runs from 200E to 200W areas (see IDM executive summary under Dismantling cost). It is estimated that the re-use value of the 24-inch piping would more than pay for the dismantling cost of this piping. On a more favorable note, it does appear as though the cost of conventional demolition can be reduced by a factor of 3 to 5 if the asbestos is removed first and the demolition is performed using competitive and commercial practices. Both estimates in this study are similar except that IDM did not include floor slab removal nor remove the same quantity of piping. This is why we are using a range of 3 to 5 as a reduction factor. The IDM estimate (using union labor) for demolition after removal of asbestos was approximately $1.5M versus $10.0M for accomplishing the work using Hanford practices and rates