z-logo
open-access-imgOpen Access
Task Technical and Quality Assurance Plan for Testing Methods to Reduce 235 Uranium Enrichment in Tank 43H Supernatant Liquid
Author(s) -
D.T. Hobbs
Publication year - 2000
Language(s) - English
Resource type - Reports
DOI - 10.2172/766285
Subject(s) - quality assurance , lift (data mining) , uranium , coating , evaporator , dissolution , nitric acid , environmental science , enriched uranium , sample (material) , waste management , nuclear engineering , process engineering , chemistry , materials science , engineering , chromatography , metallurgy , computer science , mechanical engineering , composite material , chemical engineering , operations management , heat exchanger , data mining , external quality assessment
In July of 1997, the 2H-Evaporator was shutdown due to the inability to lift material from the vessel. Inspections of the gravity drain line (GDL) showed a scale deposit coating the inside of the line. A Sample of the material was obtained and analyses performed. Plans are to chemically clean the evaporator pot by dissolving the solids in a 1.5M nitric acid solution containing depleted uranium

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here