NOx control subsystem test plan: LEBS Phase II
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/70746
Subject(s) - boiler (water heating) , nox , engineering , schedule , test plan , coal , waste management , process engineering , computer science , chemistry , operating system , mathematics , statistics , organic chemistry , weibull distribution , combustion
It is planned that NO{sub x} control subsystem testing in support of Phase II of the Low-Emissions Boiler Systems (LEBS) Project occur in ABB Power Plant Laboratories` (PPL) pilot scale Boiler Simulation Facility (BSF). This work will be performed to provide necessary design and operational information for inclusion of an optimized NO, control subsystem in the Proof-of-Concept Test Facility (POCTF) and Commercial Generating Unit (CGU) designs. The BSF is a 50 to 90x10{sup 6} BTU/hr (15 to 26 MWt) coal, oil or natural gas fired tangential furnace designed to replicate the residence time/temperature history of a utility scale tangentially fired boiler. All major aspects of a typical utility boiler are duplicated in the BSF including the lower furnace, the ash hopper, multiple burner elevations, the arch section, superheater/reheater panels, and the convective heat transfer surfaces. The furnace walls and heat transfer surfaces are cooled by a surrounding water jacket. Steam generated is vented off at atmospheric pressure so that a constant sink temperature of 100{degrees}C (212{degrees}C) is maintained. The lower furnace water walls are selectively refractory lined to maintain an appropriate furnace gas temperature history. Refractory is required because the sink temperature (100{degrees}C) is cooler than that of a typical, utility boiler, and the surface-to-volume ratio of the BSF is greater than that of a utility boiler due to scale effects. For the subject testing, the BSF will be configured as a coal fired boiler. Design and planning activities associated with the construction of the NO{sub x} control subsystem test unit will continue through June, 1995. Additionally, the schedule for specification of certain low NO{sub x} firing system components was set to allow for precursor, internal and LEBS development activities to occur and subsequently provide necessary design parameters

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here