Double Tracks revegetation and monitoring plan
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/671857
Subject(s) - revegetation , vegetation (pathology) , environmental science , soil water , plan (archaeology) , mining engineering , hydrology (agriculture) , geology , soil science , geotechnical engineering , geography , archaeology , land reclamation , medicine , pathology
This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim clean-up of radionuclide-contaminated surface soil at the Double Tracks site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the site in the fall of 1994 to evaluate the performance of several native species and to evaluate different irrigation strategies. Results of the study at Double Tracks, as well as the results from numerous studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the interim cleanup of the Double Tracks site, located northwest of the Nevada Test Site on the Nellis Air Force Range. Surface soils at Double Tracks were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. The total amount of Pu deposited on the site was between 980 and 1,600 grams and was scattered downwind south of the detonation site. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation