z-logo
open-access-imgOpen Access
Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A -- Quality assurance plan; Appendix B -- Records management plan
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/661478
Subject(s) - plan (archaeology) , oak ridge national laboratory , quality assurance , ridge , quality (philosophy) , engineering management , library science , operations management , engineering , computer science , geography , archaeology , cartography , philosophy , physics , external quality assessment , epistemology , nuclear physics
This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, which is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here