z-logo
open-access-imgOpen Access
Rotary peening with captive shot
Publication year - 1998
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/629434
Subject(s) - shot peening , shutdown , shot (pellet) , environmental science , nuclear engineering , engineering , forensic engineering , waste management , materials science , metallurgy , residual stress
Roto Peen with captive shot removes coatings and surface contamination from concrete floors. The objective of treating radioactively contaminated concrete floors during the Deactivation and Decommissioning (D and D) process is to reduce the surface contamination levels to meet regulatory criteria for unrestricted use. The US Department of Energy (DOE) Chicago Operations office and DOE`s Federal Energy Technology Center (FETC) jointly sponsored a Large-Scale Demonstration Project (LSDP) at the Chicago Pile-5 Research Reactor (CP-5) at Argonne National Laboratory-East (ANL). The objective of the LSDP is to demonstrate potentially beneficial D and D technologies in comparison with current baseline technologies. As part of the LSDP, roto Peen with captive shot was demonstrated March 17--20, 1997, to treat a 20 x 25 ft area of radioactively contaminated concrete floor on the service level of the CP-5 building

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom