Annual report RCRA post-closure monitoring and inspections for CAU 112: Area 23 hazardous waste trenches, Nevada Test Site, for the period October 1996--October 1997
Publication year - 1998
Language(s) - English
Resource type - Reports
DOI - 10.2172/629407
Subject(s) - environmental science , hydrology (agriculture) , subsidence , trench , precipitation , moisture , water content , geology , meteorology , structural basin , geography , geotechnical engineering , paleontology , chemistry , organic chemistry , layer (electronics)
The Area 23 Hazardous Waste Trenches were closed in-place in September 1993. Post-closure monitoring of the Area 23 Hazardous Waste Trenches began in October 1993. The post-closure monitoring program is used to verify that the Area 23 Hazardous Waste Trench covers are performing properly, and that there is no water infiltrating into or out of the waste trenches. The performance of the Area 23 Hazardous Waste Trenches is currently monitored using 30 neutron access tubes positioned on and along the margins of the covers. Soil moisture measurements are obtained in the soils directly beneath the trenches and compared to baseline conditions from the first year of post-closure operation. This report documents the post-closure activities between October 1996 and October 1997