
Tank 241-B-101 tank characterization plan
Author(s) -
R. Schreiber
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/61108
Subject(s) - interim , waste management , milestone , environmental science , sampling (signal processing) , engineering , telecommunications , archaeology , detector , history
The Defense Nuclear Facilities Safety Board (DNFSB) has advised the US Department of Energy (DOE) to concentrate the near-term sampling and analysis activities on identification and resolution of safety issues (Conway 1993). The data quality objective (DQO) process was chosen as a tool to be used to identify the sampling and analytical needs for the resolution of safety issues. As a result, a revision in the Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) milestone M-44 has been made, which states that ``A Tank Characterization Plan (TCP) will be developed for each double-shell tank (DST) and single-shell tank (SST) using the DQO process``. This document satisfies that requirement for tank 241-B-101 (B-101) sampling activities. Tank B-101 is identified as a low-heat load non-Watch List tank, and is classified as an assumed leaker. The tank is passively ventilated, interim stabilized, and intrusion prevention measures have been completed. As of January 31, 1995, approximately 428,000 liters of non-complexed waste was contained in the tank. Tank B-101 is expected to have two primary layers. A layer of saltcake waste generated from the 242-B evaporator, followed by a top layer of sludge composed of B-Plant high-level, B-Plant low-level, and unknown waste