Spent fuel handling and packaging program. Quarterly report, October-December 1979
Author(s) -
D.C. Durrill
Publication year - 1980
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/59717
Subject(s) - climax , calorimeter (particle physics) , environmental science , mockup , engineering , nuclear engineering , electrical engineering , ecology , detector , biology
Balance of 13 fuel assemblies for the Climax programs were received; 9 were completely encapsulated, 4 were canistered without welding; all were placed in Hot Bay lag storage. Six Climax electrically heated mockup assemblies (EHMA) were pre-assembled at E-MAD, delivered to the Climax site and assembly was completed. The BWR fuel handling tool was fabricated and proof tested. The new constant air monitor (CAM) equipment was received. Fuel Temperature Test controller modifications were completed and testing was resumed. Calorimeter equipment installation was resumed; modification of lower vertical supports was completed; and the first review draft of the operating procedure was issued. The Lag Storage Pit ventilation test was completed
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom