Simultaneous SO{sub 2}/NO{sub x} removal testing and toxics characterization. Milestone report, phase 1
Author(s) -
John G. Whitcomb,
Shiaw Tseng,
B. Lani
Publication year - 1996
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/572634
Subject(s) - task (project management) , work (physics) , milestone , computer science , test (biology) , procurement , reduction (mathematics) , characterization (materials science) , engineering , mathematics , materials science , systems engineering , nanotechnology , mechanical engineering , business , paleontology , geometry , marketing , biology , archaeology , history
This report describes the work completed in the first phase of the Simultaneous SO{sub 2}/NO{sub x} Removal Testing and Toxics Characterization test program. Tasks covered in this report as specified in the Statement of Work included: Task 1.2.0 Equipment Modification and Reagents Procurement; Task 1.3.0 Testing at the 5 kW Scale; Task 1.3.1 Temperature Enhanced Fe(III)EDTA Reduction; Task 1.3.2 Electrolytic Cell Fe(III) EDTA Reduction; Task 1.3.3 Chemical Regeneration Agents Testing; Task 1.3.4 Combination of Strategies; Task 1.4.0 Data Analysis and Phase I Report. Proposed in Task 1.3.4 are combinations of regeneration methods (based on data generated in Tasks 1.3.1 to 1.3.3) that gave the best results at the lowest possible cost. The Test Plan approval (Task 1.1.0) was previously submitted under separate cover
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom