z-logo
open-access-imgOpen Access
FY97 ICCS prototype specification
Author(s) -
John P. Woodruff
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/568041
Subject(s) - computer science , software engineering , emulation , process (computing) , software , software development , product (mathematics) , systems engineering , programming language , engineering , geometry , mathematics , economics , economic growth
The ICCS software team will implement and test two iterations of their software product during FY97. The first of these iterations will concentrate on construction of selected framework components; the subsequent iteration will extend the product and perform measurements of performance based on emulated FEP devices. This document specifies the products to be delivered in that first prototype and projects the direction that the second prototype will take. Detailed specification of the later iteration will be written when the results of the first iteration are complete. The selection of frameworks to be implemented early is made on a basis of risk analysis from the point of view of future development in the ICCS project. The prototype will address risks in integration of object- oriented components, in refining our development process, and in emulation testing for FEP devices. This document is a specification that identifies products and processes to undertake for resolving these risks. The goals of this activity are to exercise our development process at a modest scale and to probe our architecture plan for fundamental limits and failure modes. The product of the iterations will be the framework software which will be useful in future ICCS code. Thus the FY97 products are intended for internal usage by the ICCS team and for demonstration to the FEP software developers of the strategy for integrating supervisory software with FEP computers. This will be the first of several expected iterations of the software development process and the performance measurements that ICCS will demonstrate, intended to support confidence in our ability to meet project RAM goals. The design of the application software is being carried out in a separate WBS 1.5.2 activity. The design activity has as its FY97 product a series of Software Design Documents that will specify the functionality of the controls software of ICCS. During the testing of this year`s prototypes, the application functionality needed for test will be provided by sample maintenance controls. These are early precursors of controls that can be used for low level device control. Since the devices under test will be represented by software emulation, these maintenance controls will be first drafts of the eventual product and will be useful only for ICCS team testing

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here