z-logo
open-access-imgOpen Access
Site Operator technical report. Final report (1992--1996)
Publication year - 1996
Language(s) - English
Resource type - Reports
DOI - 10.2172/491544
Subject(s) - engineering , aeronautics , automotive industry , automotive engineering , coast guard , marine engineering , aerospace engineering
The Southern California Edison Company (SCE) and the US Department of Energy (DOE) entered into cooperative agreement No. DE-FC07-91ID13077 on August 23, 1991, which expired on August 3, 1996. This cooperative agreement provided SCE with DOE cofunding for participation in the DOE`s Electric and Hybrid Vehicle Site Operator Program. In return, SCE provided the DOE with quarterly progress reports which include operating and maintenance data for the electric (EVs) vehicles in SCE`s fleet. Herein is SCE`s final report for the 1992 to 1996 agreement period. As of September 1, 1996 the SCE fleet had 65 electric vehicles in service. A total of 578,200 miles had been logged. During the agreement period, SCE sent the DOE a total of 19 technical reports (Appendix B). This report summarizes the technical achievements which took place during a long, productive and rewarding, relationship with the DOE

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here