Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly progress report, June 13, 1996--September 12, 1996
Publication year - 1996
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/459907
Subject(s) - reservoir modeling , infill , petroleum engineering , reservoir engineering , drilling , geology , characterization (materials science) , reservoir simulation , quarter (canadian coin) , engineering , civil engineering , petroleum , geography , mechanical engineering , archaeology , paleontology , materials science , nanotechnology
At this time, eighteen (18) 10-acre infill wells have been drilled as part of the Field Demonstration phase of the project. Of the fourteen producing wells drilled to date, twelve are currently on production, and ten are pumped-off and producing at stable rates. Current Unit production is approximately 3,600-3,700 STBO/D, and approximately 850 STBO/D incremental production has been added to date. The remaining producing well and four injection wells are currently being completed. A change in the Statement of Work has been approved so that we can drill additional 10-acre infill wells during the next quarter as budget constraints allow. Production flowlines are laid for each new producing well as they are put on production. Injection lines are being laid for the injection wells as they are completed. All data required for the validation of the Budget Period I Reservoir Characterization, Reservoir Management, and Reservoir Simulation Studies are being acquired and analyzed during the Field Demonstration Period

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom