Post-piledriver re-entry
Author(s) -
D.D. Rabb
Publication year - 1967
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/459791
Subject(s) - collar , geology , drilling , mining engineering , forensic engineering , engineering , structural engineering , mechanical engineering
This report details post-Piledriver Re-entry. Re-entry down the Piledriver shaft went slowly. The shaft collar had bounced so high and hard that there was a separation directly under the collar and approximately 30 feet vertically of shaft wall in that area spalled off and fell into the skip Docket. The collar area had to be packed with new concrete prior to advancing further downshaft. Drilling, sampling, gas analysis, and radiation monitoring activities are detailed
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom