z-logo
open-access-imgOpen Access
Hot dry rock energy: Hot dry rock geothermal development program. Progress report. Fiscal year 1993
Author(s) -
Joaquin Teyssier Salazar,
Murray W. Brown
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/45603
Subject(s) - interim , schedule , test (biology) , fiscal year , shut down , environmental science , productivity , engineering , petroleum engineering , geology , computer science , nuclear engineering , archaeology , geography , business , economics , finance , operating system , macroeconomics , paleontology
Extended flow testing at the Fenton Hill Hot Dry Rock (HDR) test facility concluded in Fiscal Year 1993 with the completion of Phase 2 of the long-term flow test (LTFT) program. As is reported in detail in this report, the second phase of the LTFT, although only 55 days in duration, confirmed in every way the encouraging test results of the 112-day Phase I LTFT carried out in Fiscal Year 1992. Interim flow testing was conducted early in FY 1993 during the period between the two LTFT segments. In addition, two brief tests involving operation of the reservoir on a cyclic schedule were run at the end of the Phase 2 LTFT. These interim and cyclic tests provided an opportunity to conduct evaluations and field demonstrations of several reservoir engineering concepts that can now be applied to significantly increase the productivity of HDR systems. The Fenton Hill HDR test facility was shut down and brought into standby status during the last part of FY 1993. Unfortunately, the world`s largest, deepest, and most productive HDR reservoir has gone essentially unused since that time

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here