Improvement of storage, handling, and transportability of fine coal. Final report
Author(s) -
R.C. Maxwell,
P.R. Jamison
Publication year - 1996
Language(s) - English
Resource type - Reports
DOI - 10.2172/436443
Subject(s) - coal , clean coal , commercialization , waste management , clean coal technology , process engineering , environmental science , coal preparation plant , engineering , process (computing) , moisture , computer science , materials science , composite material , political science , law , operating system
The Mulled Coal process is a technology which has evolved from a line of investigations which began in the 1970`s. There was a major breakthrough in 1990, and since then, with significant support from DOE-PETC, the technology has progressed from the conceptual stage to a proven laboratory process. It is a simple process which involves the addition of a low cost specifically formulated reagent to wet fine coal by mixing the two in a pug mill. Although the converted material (Mulled Coal) retains some of its original surface moisture, it handles, transports, and stores like dry coal. But, unlike thermally dried fine coal Mulled Coal is not dusty, it will not rewet, and it causes no fugitive dust problems. This project was designed to advance the technology from the status of a process which works well in the laboratory to the status of a technology which is fully ready for commercialization. Project objectives were to: 1. Prove the concept that the technology can be used to produce Mulled Coal of a consistent quality, on a continuous basis, at a convincing rate of production, and at a major preparation plant which produces fine clean coal on a commercial basis. 2. Prove the concept that Mulled Coal, either as a blend with coarser clean coal or as a stand-alone fuel will successfully pass through a representative cross section of conventional coal storage, handling and transportation environments without causing any of the problems normally associated with wet fine coal. 3 Test the design and reliability of Mulled Coal circuit equipment and controls. 4. Test the circuit over a wide range of operating conditions. 5. Project scale-up designs for major equipment components and control circuits. 6. Forecast capital and operating costs for commercial circuits ranging from 25 TPH to 75 TPH. This report describes the work, the test results, and conclusions at each step along the way