Completion report for the isolation and remediation of inactive liquid low-level radioactive waste tanks 7562, H-209, and T-30 at Oak Ridge National Laboratory, Oak Ridge, Tennessee
Publication year - 1996
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/432898
Subject(s) - oak ridge national laboratory , ridge , radioactive waste , waste management , remedial action , environmental science , piping , environmental remediation , hydrology (agriculture) , environmental engineering , archaeology , engineering , contamination , geography , geotechnical engineering , ecology , cartography , nuclear physics , biology , physics
A human health risk analysis was conducted on inactive tanks 7562, H-209 and T-30 to determine the method for remediating the tanks. Risk analysis results indicated that the health risk associated with these tanks were within or below the EPA range of concern of 1 {times} 10{sup {minus}4} to 1 {times} 10{sup {minus}6}. On the basis of these results, and with regulator approval, it was determined that either no action or in-place stabilization of the tanks would satisfy risk-based remediation goals. Therefore, a decision was made and approved by DOE to remediate these tanks in-place as a maintenance action. Tanks H-209 and T-30 were isolated from associated piping, electrical systems, and instrumentation and grouted in-place. Due to regulatory concerns over the location of tank 7562 relative to an area of subsurface soil contamination, tank 7562 was isolated from associated piping and instrumentation and left in-place empty. Completion of these maintenance actions has met the intent of the Federal Facility Agreement (FFA) for remediation of inactive tanks H-209 and T-30. EPA and Tennessee Department of Environment and Conservation (TDEC) will be requested to approve a change to the FFA removing tanks H-209 and T-30 from the Appendix F list of inactive tanks. The request for removal of tank 7562 from Appendix F will be submitted pending final disposition of the tank. Since the associated tank piping systems remain in-place, it will further be requested that these systems be included as individual sites in Appendix C of the FFA for future remedial consideration
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom