CHEMICAL TECHNOLOGY DIVISION, UNIT OPERATIONS SECTION MONTHLY PROGRESS REPORT FOR APRIL 1959
Author(s) -
J C Bresee,
P A Haas,
R W Horton,
C D Watson,
M E Whatley
Publication year - 1959
Language(s) - English
Resource type - Reports
DOI - 10.2172/4157165
Subject(s) - slurry , sorption , boiling , chemistry , chloride , materials science , analytical chemistry (journal) , metallurgy , chromatography , composite material , organic chemistry , adsorption
A concentration cell electrode was installed in a fritted glass surface and was used to measure the surface KCl concentration while water was being transpired through the surface into a mixed tank of 0.1 M KCl. The results from the first Fluorox run made with crude UF/sub 4/ showed that 85.3% of the theoretical amount of UF/sub 6/ was accounted for, with 17.9% being collected in cold traps and the remainder being consumed in various side reactions. Installation was completed of apparatus to study the electrolytic removal of nickel on an engineering scale from concentrated HRT fuel solution. An extremely low yield stress of 0.02 lb/sq ft was measured for a thoria-urania slurry containing 2.5 wt.% Al/sub 2/O/sub 3/ and spherical particles of 1.7 micron mean diameter. Preliminary data on the rate of uranium sorption on Dowex 21K from sulfate solutions were correlated with a simple spherical diffusion model. Laboratory scale studies to determine the effect of reflux time, HNO/sub 3/ concentration, and air sparge on chloride removal from APPR-type Darex dissolver product showed that an air sparge is definitely beneficial in chloride removal. Preliminary cyclic cleaning tests showed that boiling 25% caustic solution was adequate for cleaning type F (20 micron) porous metal filter elements fouled in the absence of filter aid with siliceous sludge from Darex solvent extraction feed solutions. Sections of unirradiated stainless steel-clad UO/sub 2/, sheared into lengths of 1/2 in., 1 in., 2 in., and 2 3/4 in., were leached free of UO/sub 2/ with 10 M HNO/sub 3/ in 30, 45, 60, and 75 min, respectively. The abrasive blade cost for the removal of inert end adapters from selected reactor assemblies ranges from 12 for the Gas-Cooled Reactor to 19 for Consolidated Edison. A zirconium dissolution was carried to completion at 600 ction prod- C in a NaF-LiF salt mixture containing initially 23 mol per cent ZrF/sub 4/ at an average rate of 1.3 mg/(cm/sup 2/)(min) with an HF feed rate of 2 lb/hr. The thermal conductivity and thermal diffusivity at the center of an 8-in. diameter cake of Darex waste calcined at about 900 ction prod- C were determined as a function of temperature. (For preceding period see CF-59-3-61.) (auth