z-logo
open-access-imgOpen Access
STANDARD OPERATING PROCEDURE FOR TSR-II
Author(s) -
Jonathan S. Lewin
Publication year - 1960
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/4156581
Subject(s) - shutdown , tower , electromagnetic shielding , nuclear engineering , reliability engineering , environmental science , computer science , engineering , electrical engineering , structural engineering
The daily check list, the startup procedure both for in-pool and in-air operation, and the normal shutdown procedure for the Tower Shielding Reactor-II are outlined. The sequence of events which leads to each annunciator warning and the automatic corrective action which is then initiated by the control circuits are described. (auth

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom