Engineering task plan for BX/BY compressor upgrade
Author(s) -
R.G. Strand
Publication year - 1995
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/41291
Subject(s) - upgrade , horsepower , task (project management) , work (physics) , piping , plan (archaeology) , engineering , air compressor , gas compressor , compressor station , civil engineering , computer science , systems engineering , mechanical engineering , automotive engineering , geology , operating system , paleontology
This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ``BX-BY Compressor Upgrade`` dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable. The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom