Quarterly operating report. Fourth quarter 1974
Publication year - 1974
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/4113341
Subject(s) - purge , pressurizer , nuclear engineering , coolant , heat exchanger , boiler (water heating) , environmental science , waste management , heat recovery steam generator , superheater , engineering , mechanical engineering , thermal power station
During the fourth quarter of 1974, the Shippingport Atomic Power Station was shutdown for PWR/LWBR (Pressurized Water Reactor/Light Water Breeder Reactor) Core Conversion. On December 26 while performing a cooldown, following a heat-up test, on operational incident occurred during which the cooldown rate exceeded the 10$sup 0$F/hour allowable limit. A cooldown rate of 13$sup 0$F to 14$sup 0$F/ hour was experienced for a two hour period. After an evaluation of this incident, it was concluded that no deleterious effects to the primary coolant system occurred. Defueling operations continued during the fourth quarter. (auth
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom