Xenon Transient Tests: Core I, Seed 2, 149.8 EFPH: Section 1 - Test Results T-612081
Publication year - 1960
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/4091338
Subject(s) - section (typography) , transient (computer programming) , xenon , test (biology) , core (optical fiber) , nuclear engineering , materials science , physics , nuclear physics , composite material , geology , computer science , engineering , programming language , operating system , paleontology
A test was made to determine if there is sufficient excess reactivity in the core to override a peak xenon transient and to obtain dath for rod-worth calculations. After 149.8 EFPH's of plant operation on seed 2, there was sufficient excess reactivity to override peak xenon. Criticality during peak xenon was maintained with group III and group IV rods inserted, group I rods withdrawn to approximately -69 in., and group II rods withdrawn to approximately - 29 in. The override of peak xenon occurred 8 hr and 45 min after shutdown. (W.L.H.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom