Open Access
Initial Approach to Criticality: Core 1, Seed 2 - Test Results T-5500126
Author(s) -
AUTHOR_ID
Publication year - 1960
Language(s) - English
Resource type - Reports
DOI - 10.2172/4085353
Subject(s) - criticality , remainder , core (optical fiber) , control rod , computer science , mathematics , nuclear engineering , nuclear physics , physics , arithmetic , engineering , telecommunications
A test was made to bring core 1, seed 2 to the critical condition and to determine the critical rod bank height. Core 1, seed 2 was brought to criticality on a rod bank consisting of the control rods on inverters one and seven at a rod bank height of 24.70 in. (W.L.H.