z-logo
open-access-imgOpen Access
RADIATION SURVEY OF BEWI AND ASEWI REFUELING. CORE 1, SEED 1. Test Results T-643709
Author(s) -
Not Given Author
Publication year - 1961
Language(s) - English
Resource type - Reports
DOI - 10.2172/4057607
Subject(s) - shutdown , nuclear engineering , blanket , boiler (water heating) , coolant , criticality , environmental science , waste management , materials science , engineering , nuclear physics , physics , composite material , mechanical engineering
The radiation survey of the Blanket Exit Water Instrumentation assemblies Core I, Seed 1 was performed on January 15 and 16, 1960, approximately 100 days after reactor shutdown at 5806 EFPH. The observed radiation levels varied with height from 150 to 500 mr/hr; the highest activity was found at the bottom of both support tubes of each of the four assemblies monitored, which, in operation, would be located 5 in. above the top of the blanket fuel assembly. The two inner port Blanket Exit Water Instrumentation units and the two Auxiliary Seed Exit Water Instrumentation assemblies were not monitored. (D.L.C.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here