z-logo
open-access-imgOpen Access
Completion report for well ER-30-1
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/395660
Subject(s) - drilling , petroleum engineering , completion (oil and gas wells) , dual (grammatical number) , groundwater , geology , lost circulation , water well , circulation (fluid dynamics) , drilling fluid , engineering , geotechnical engineering , mechanical engineering , art , literature , aerospace engineering
Well ER-30-1 was drilled for the U.S. Department of Energy (DOE), Nevada Operations Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS). IT Corporation (IT) was the principal environmental contractor for the project. The roles and responsibilities of IT and other contractors involved in the project are described in the Raytheon Services Nevada (RSN) Drilling and Completion Programs and the Underground Test Area Operable Unit Project Management Plan. The Well ER-30-1 investigation is part of the DOE`s Underground Test Area (UGTA) Project at the NTS, the goals of which include collecting geological, geophysical, hydrological, and water-chemistry data from new and existing wells to define groundwater migration pathways, rates of migration, and groundwater quality at the NTS. The well will become part of the UGTA monitoring well network

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here