Ventilation criteria for IDMS facility
Author(s) -
D.P. Lambert
Publication year - 1996
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/392769
Subject(s) - mercury (programming language) , environmental science , benzene , waste management , computer science , engineering , chemistry , organic chemistry , programming language
Both Facility Evaluation Board (FEB) reviews of the Integrated DWPF Melter System (IDMS) have identified the inconsistency of the current IDMS Process Hazards Review (PHR) versus actual IDMS practice as regards the criteria to contain air borne pollutants that may be present in the Process Room (e.g. benzene and mercury). The PHR states that a 1.0 in. wc pressure differential be maintained between the IDMS Process Room and Building 672-T. In addition, the PHR further specifies that the linear velocity through openings into the Process Room (e.g. open doors) be equal to or greater than 150 fpm. Finally, the PHR recommended that mercury vapor and benzene monitors be installed in the Process Room ventilation exhaust to alert personnel to the presence of vapors of benzene and/or mercury before entering the Process Room. This report summarizes the results of reassessment of these criteria and the specific recommendation for permanent installation of mercury and benzene vapor monitors in the vapor exhaust of the Process Room
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom